Stair Case, Oven, Base Boards, Mirrors, and Shower Door
As you can see above we got a lot of work finished this Thanksgiving weekend. All the Base is down on the hard wood flooring. The master bath has the mirrors, lights, and shower door in. We are almost finished with all the back splash on the kitchen and the Double Oven is installed and working. Not much left now! Trim on the kitchen cabinets, carpet and trim after the carpet is installed and we will be in before Christmas!

