Monday, September 24, 2007

Floor Tile And Fire Place

















The Floor Tile for the Master Bath is finished other than the Grout. We laid almost 200 Sq. Ft. of tile this weekend and have 400 to go. Out lay out is on a 45 degree angle with 1/4" spacing. Our Fireplace is laid out with Western Ledge Foe Rock Thanks to James Nicely our rock turned out to look amazing. He was able to come in and install all the rock in one day! James is great at what he does and I highly recommend him. You can e-mail him at Rockymanston@zoomtown.com Once our Mantel comes in our Fire Place will be complete.




Monday, September 17, 2007

Flooring and Fire Place

No pictures to show this week. We are working on Prepping the Fire Place and the floors so that the Foe Rock can be installed and we can install the Hard wood Flooring. We also picked up the Foyer Balcony rails and wood so it can be stained.

Tuesday, September 04, 2007

Trim, Kitchen, Bar, and Doors

Living Room Window With Trim
Kitchen Bar

Kitchen


Master Bath With Window Trim



Half Bath Vanity




Upstairs Bedroom Entry





Living Room

Thanks to Rick and Tim the majority of the windows are trimmed out and they look great! We have All the doors installed on the first and second floor and they are also ready to be trimmed out. We can now move on to counter tops since we know how high and where our Bar is located. The kitchen has all the cabinets in and we also have the microwave in. We also have electric now and had very minimal circuits to double check or have problems. Thanks to Kyla and Lynn the stain on the doors and trim look great!