Friday, May 18, 2007

Passed Inspections!





We passed our rough inspection, and now can move on to insulation and drywall. We built the framing of the fireplace with metal studs and permarock to protect the wood studs on the corner from heat. We should have the insulation finished by this weekend and have some of the first floor drywalled.

0 Comments:

Post a Comment

<< Home

fosamax