Wednesday, May 30, 2007

Drywall




We have finished the drywall on the 2nd floor and the ceilings on the 1st. Insulation is almost finished and the mud work will begin soon!


Friday, May 18, 2007

Passed Inspections!





We passed our rough inspection, and now can move on to insulation and drywall. We built the framing of the fireplace with metal studs and permarock to protect the wood studs on the corner from heat. We should have the insulation finished by this weekend and have some of the first floor drywalled.

Monday, May 07, 2007

Wood Burning Stove




We have installed the wood burning stove and the stack. 20' of stainless pipe and a stove able to heat 1500 sq foot of the house. If you want a company that knows Fire Places This is the place!We should be ready for rough inspection by the 14th.